Triple C Cloud Computing Tier IV Datacenter Israel

Triple C Cloud Computing Tier IV Datacenter Israel Data Center, Israel

  • Triple C Cloud Computing Tier IV Datacenter Israel

Standards and Certifications • SLI ISO-9001 and sub - the company is certified and complies with standard ISO-9001. • The facility designed and constructed according to the Tier IV and Tier II under EIA/TIA 942-A standards. • The facility conforms to the standard ISO-27001 (Standard that replaces 17799). • The building, like the facility itself, was built according to the safety standards required by law. • The facility and the structure comply with Fire-code requirements. • Meeting 1001 standard and all its subsections. • The facility is meeting the 1220-11 standard (fire safety standard). • Essential enterprise confirmation (ML"H). Facility structure • Two subterranean levels totaling 1,343 square meters, fire-safe and energy backup. • Two upper levels totaling 838 square meters, fire-safe and energy backup. • Building Management System (BMS) and control system to detect immediate electrical, air conditioning and fire-safe systems issues. • Advanced security 24X7 Including biometric identification and CCTV, Security presence 24X7 and strict entry procedures. The facility meets security standard ISO-27001. • Work rooms for customers that enable remote connection to servers. • Emergency computerized working rooms (BCP) for Data Center customer's use. • Secondary DR facility in Haifa and a third-party backup facility in Cyprus. Facility security Advanced facility security - Multi-layered security including: • Controlled access 24 Hours a day. • Controlled entry and biometric identification. • Camera surveillance and documentation. • The site is staffed 24 Hours a day. Electricity • Dual power connections with a maximum power of 5MW. • Dual power supply to the Racks with up to 12KW or 64A per Rack. 32A or 16A connection, in a single-phase or three-phase connection as required. • Electric Backup by redundancy of 2(N+1) UPS's. • Utility company backup by redundancy of 2N generators. Connectivity and communications • Triple C have Internet Service Provider license (ISP) from the Ministry of Communications. • The Data Center connected via fiber optic cables to all infrastructure companies in Israel: Bezeq, HOT, Cellcom and Partner. • The site linked to the three underwater fiber optic cables running from Israel to Europe for international communication: Tamares Telecom cable, the MedNautilus cable and the Bezeq International cable. • The site has a direct link connection to Partner, Cellcom, Bezeq International and Med-1 sites. Air conditioning and cooling Cooling bases with "IN-ROW" technology in the subterranean level a cooling technology that enables High Density systems hosting. This method is based on the hot corridor closing, which allowing a more effective utilization of cooling energy while separating the cold and hot air. The facility has an automatic temperature control, which maintains a temperature of 22-24 ° C, with humidity of 40% -60%. The entire air conditioning and cooling systems are backed up and includes: • An array of chillers configured to N + 1 for redundancy. • Dual cold water supply system. • Racks cooling configured to N + 1 for redundancy. • Additional perimeter CRAC configured to N + 1 for redundancy.

Triple C Cloud Computing, Petach Tikva, Israel
Ha Sivim 49
4959504

Power Redundancy

2x(N+1)

Cooling Redundancy

N+1

5MW Power Capacity 17760sq. ft. 500 Total racks ISO 27001 ISO 9001:2015
Office space Business continuity services Secure Cabinet Rack Cabinets Co-location services Individual servers Dedicated Servers Virtual Servers Managed Storage Managed Services Virtual Private Network Remote Hands Smart Hands Migration Planning

Visit Triple C Cloud Computing Tier IV Datacenter Israel website

Featured Data Centers